These are the questions buyers, sellers and owners actually ask us, answered from the Building and Energy industry bulletins and the Australian Standards rather than from general advice written for another state. Each guide cites what it draws on, so you can check the source yourself. Where a rule turns on a date — and several of the most important do — the guide gives you the date and tells you which side of it your house sits on.
They fall into three groups. Compliance at sale and transfer: smoke alarms, RCDs, and the obligations that catch sellers out. Defects and how they are read: ceilings that fail, roof tie-downs, chemical delignification, and wet areas. Termites: the management standards and the inspection zone most Perth houses build over. Start anywhere — each one links to the ones next to it.
Western Australia requires compliant mains-powered smoke alarms before a home changes hands. What that means, when a bat…
Read more →Interconnection is required for newer WA homes and not for older ones. The cut-off is 1 May 2015, and it is the building…
Read more →WA amended its smoke alarm regulations for dwellings offered as short-term rental accommodation. What changed, who it ap…
Read more →Building and Energy investigated unexplained plasterboard ceiling collapses in WA homes. What they found, which years ar…
Read more →AS 3660 governs termite management in Australian buildings. What it covers, what it deliberately does not, and the inspe…
Read more →Building and Energy inspected 123 sheet metal clad timber framed roofs in WA and found a low level of compliance.…
Read more →Waterproofing under AS 3740, who is licensed to do it in WA, the four places wet areas leak, and why Perth winters are w…
Read more →WA pool barrier rules: the 300mm definition, AS 1926.1, the November 2001 threshold, gate and non-climbable-zone traps, …
Read more →Subfloor ventilation in Perth's timber-floored and suspended-slab homes: why the void has to breathe, the 150mm rule, ho…
Read more →WA builder registration, how to verify it, and the licence-lending risk Building and Energy warned about — why the name …
Read more →Work must match the approved plans. Building and Energy's Industry Bulletin 154, where builds depart from their approval…
Read more →A registered builder must manage and supervise the work under their registration. Industry Bulletin 153, why thin superv…
Read more →Bushfire Attack Level assessment under AS 3959: the bands from BAL-LOW to BAL-FZ, when it is required, what each level c…
Read more →Is the block bushfire-prone, what that means for an existing house, what triggers a BAL assessment, and the ember-vulner…
Read more →The AS 4349.1 defect type where the building fabric has ruptured or broken, why cracking is the headline case, and when …
Read more →The AS 4349.1 defect type where an element has moved or twisted out of position — bowing, racking, leaning — usually the…
Read more →The AS 4349.1 defect type for moisture entering where it shouldn't — rising damp, salt damp, leaks and poor drainage — a…
Read more →The AS 4349.1 defect type covering rust, rot, corrosion, decay and chemical breakdown — including delignification…
Read more →The AS 4349.1 defect type for components that don't function — windows, doors, drainage — mostly maintenance, but someti…
Read more →The AS 4349.1 defect type for work installed badly, wrongly, or missing — the standard names missing tie-downs and missi…
Read more →Footing movement on Perth's reactive clay: why it happens, AS 2870 site classes, how it shows up, and when it meets the …
Read more →Rectifying footing movement in Perth: stabilising moisture first, underpinning methods, the structural engineer and regi…
Read more →Concrete spalling (concrete cancer) in coastal Perth: how chloride and carbonation rust the reinforcement, why balconies…
Read more →Rectifying concrete spalling in Perth: why patching fails, proper corrosion-arrest repair, the structural engineer and c…
Read more →Fungal decay in structural timber in Perth: the 20% moisture threshold, where bearers and framing rot, AS 1684.2 durabil…
Read more →Rectifying structural timber decay in Perth: fixing the moisture source first, replacing to correct durability, the engi…
Read more →Combustible cladding on WA apartments: what the BCA requires, the state-wide audit that referred 52 buildings for buildi…
Read more →Wind classification under AS 4055 and AS/NZS 1170.2: how getting it wrong under-builds a house, why tie-down requirement…
Read more →Home indemnity insurance in WA: what it covers, the $20,000 threshold, when the builder must provide the certificate…
Read more →WA requires heated water delivered at max 50C to showers, baths and basins. The 1 May 2024 expansion, the Legionella bal…
Read more →Wet-area floor wastes and grading under AS 3740 and the NCC: the minimum falls, why membrane errors around the waste cau…
Read more →External balcony and podium waterproofing under AS 4654.1 and AS 4654.2 and the NCC: why it differs from internal wet ar…
Read more →Ventilation and condensation under the NCC: why houses get damp inside, interstitial condensation in cavities, the exhau…
Read more →NatHERS energy ratings for new WA homes: the 6-to-7-star lift from 1 May 2025, the new Whole-of-Home requirement, NCC 20…
Read more →The national lead-free plumbing rule: Clause A5G4 of the PCA limiting copper alloy fittings to 0.25% lead, the 2026-2028…
Read more →WA building permits: the certified (BA1) and uncertified (BA2) routes, the 10 vs 25 business-day timeframes, Schedule 4 …
Read more →The WA Notice of Completion (form BA7) under section 33 of the Building Act: the seven-day rule, the $10,000 penalty, th…
Read more →WA building levies: the Building Services Levy and the CTF levy, how the value of work is estimated under Schedule 1…
Read more →WA's 2020 strata reforms: the compulsory pre-contract disclosure that lets you evaluate a scheme's finances, SAT as the …
Read more →WA sewer connection rules: drainage plumbing runs to the main sewer junction (IB 163), the 1 July 2024 PLB certification…
Read more →WA owner-builder rules: Building Services Board approval, the owner-builder course, the six-year rule, and the seven-yea…
Read more →The WA drainage plumbing diagram: what it records, why you need it before digging or landscaping, how it fits the 2024 c…
Read more →Flashing roof penetrations on metal roofs in Perth: the AS 1562.1 clause 4.8 drainage rule, why over-reliance on sealant…
Read more →The batten-to-rafter connection under AS 1684.2 Section 9 and Table 9.25: why it's critical against wind uplift, the IB …
Read more →WA's fire-separation rule for roofed outdoor areas: WA H3D7 and Part 9.6 of the ABCB Housing Provisions, why alfrescos a…
Read more →Fastener corrosion on Perth's coast: AS 3566.2 corrosion classes (Class 3 vs Class 4), the same-service-life rule, galva…
Read more →WA retaining wall rules: the 500mm permit threshold measured from the low side, when a structural engineer and AS 4678 a…
Read more →What a WA pre-purchase building inspection covers under AS 4349.1: visual and non-invasive, readily accessible areas, th…
Read more →Termite management for new WA homes under AS 3660.1: physical vs chemical barriers, why timing before the slab pour is c…
Read more →Dilapidation reports in Perth: the pre-construction condition record that protects you when neighbouring demolition or e…
Read more →Most building-defect advice online was written for framed houses on reactive clay in Sydney or Melbourne. Perth is mostly double brick on sand, its ground changes as you move inland, and its worst roof defect barely exists on the east coast. A guide that does not know that is worse than no guide, because it sounds right. Everything here is written for this city, by a registered building contractor, and cited so you are not taking our word for it.
Tell us about the property and what you need. We'll come back to you with a firm quote and a time.