Pricing

Flat fees, the same whatever the size of the home. Ring MISSING: phone number with the property details to book, or read on for what each fee includes.

Building inspections

InspectionFee
Pre-purchase inspection (building only)$440inc. GST ($400 + GST)
Pre-purchase building & timber pest inspection$616inc. GST ($560 + GST)
Building inspection (investigation)$495inc. GST ($450 + GST)
Dilapidation report$440inc. GST ($400 + GST)

New construction staged inspections

InspectionFee
Pre-slab stage inspection$770inc. GST ($700 + GST)
Frame stage inspection$770inc. GST ($700 + GST)
Lock-up (pre-plaster) stage inspection$770inc. GST ($700 + GST)
Pre-paint stage inspection$770inc. GST ($700 + GST)
Final handover inspection$935inc. GST ($850 + GST)

Litigation and dispute work

Scott Schedule (loss or rectification cost estimate)$350 per hour, minimum 8 hours

A flat fee, whatever the house

Our inspection fees are flat. A one-bedroom villa and a four-bedroom double-storey pay the same price for the same inspection type, so you know the number before we have seen the property and there is nothing to renegotiate once we arrive. The building and timber pest inspection is a single fee of $616 including GST ($560 + GST) regardless of the size of the home, and the staged inspections on a new build are each a flat fee as well.

What does not change the price is what we find. We are not paid more for a clean report or less for a damning one, and it matters that this is true: an inspector whose fee depended on the result would have a reason to shade it. Ours does not.

What the fee includes

The inspection itself, carried out against the relevant standard — AS 4349.1 for a building inspection, AS 4349.3 for timber pest. The written report, with every defect photographed, located and explained, delivered within 24 hours of the inspection on pre-purchase and pre-settlement work. And a phone call afterwards if you want the report talked through, because a defect list you do not understand is not much use under time pressure.

What it does not include

Specialist work the standard itself hands off: a structural engineer where the footings are in question, a licensed electrician for the wiring, a licensed asbestos assessor where sampling is needed. The report tells you when one of those is warranted and why, but arranging and paying for them is separate. An inspection that claimed to cover all of them would be an inspection that had not read its own standard.

Booking

Ring MISSING: phone number with the address and the property details and you get a firm quote rather than a range. The nine inspection types each have their own page explaining what is and is not covered, and if you are not sure which you need, the pre-purchase inspection is the right starting point for most buyers.

How long litigation matters usually run:

Small-scale matters8 to 14 hours
Medium-scale matters14 to 20 hours
Large-scale mattersover 21 hours

Prices shown are the total payable, including 10% GST. The ex-GST component is shown in brackets. Expert-witness and litigation rates below are quoted ex GST, as that work is typically business-to-business.

Guide only. Contact us with the property details and we will quote accurately.