Independent inspection to AS 4349.1 by a registered building contractor. What you are buying, read by someone who has built. Report within 24 hours.
A pre-purchase building inspection in Bickley reads a rural-residential home in the Bickley Brook valley — where the brook's near-permanent watercourse moisture, the former vineyard and orchard soil and the Darling Range Regional Park ridge boundary are the three site factors that shape every pre-purchase read in the suburb. The inspection is building scope only, to AS 4349.1, and in Bickley the pre-purchase read begins at the watercourse: is the specific lot adjacent to the brook, and if so, what has the year-round watercourse moisture done to the subfloor and perimeter conditions over the life of the home.
Brook adjacency is the first pre-purchase site question. For brook-adjacent lots, the near-permanent watercourse moisture maintaining year-round soil saturation beyond the summer dry period is the dominant pre-purchase site factor. For non-brook lots, the former vineyard and orchard soil organic moisture retention and the valley moisture are the site factors alongside the standard construction-era building read.
The Regional Park ridge boundary is the pre-purchase pest context for ridge and upper-slope lots. The combined building and pest inspection is strongly recommended throughout Bickley given the watercourse and valley moisture conditions. The report follows within 24 hours.
We run the same inspection across the area, including nearby Carmel and Orange Grove.
MISSING: phone number · Book online → · Flat $440 inc GST, report within 24 hours.
A building inspection to AS 4349.1 in the Bickley Brook valley, where brook adjacency, former vineyard and orchard soil moisture, and the Regional Park ridge boundary are the three pre-purchase site factors.
No — but the combined inspection is strongly recommended throughout Bickley given the year-round watercourse and valley moisture conditions.
Near-permanent watercourse moisture maintains year-round soil saturation beyond the coastal-plain summer dry period on brook-adjacent lots. The pre-purchase read determines what that persistent moisture has done to the subfloor and perimeter over the life of the home.
Former vineyard and orchard soil organic moisture retention and the valley moisture environment alongside the standard construction-era building read.
Ridge and upper-slope lots backing the park carry native jarrah and marri — the highest combined termite conditions in the suburb given the Bickley Brook valley moisture already present.
Wide range: older farmhouses, 1970s-1980s rural-residential and newer custom builds. Each earns its construction-era read in the Bickley valley setting.
Yes. Brook adjacency moisture findings and construction-era conditions give you a factual pre-purchase basis.
Yes, critically. The combined inspection is strongly recommended in Bickley.
Yes. Subfloor moisture management against the brook and valley moisture baseline is the primary pre-purchase structural read for brook-adjacent lots.
Within 24 hours of the inspection.
Also available as a combined building and timber pest inspection in Bickley — both scopes in one visit to AS 4349.1 and AS 4349.3, one report within 24 hours.
Combined B&P inspection →Our office is at Suite 55, 15 Labouchere Road, South Perth WA 6151 — on the Swan River foreshore near the Perth Zoo.
Tell us about the property and what you need. We'll come back to you with a firm quote and a time.