Independent inspection to AS 4349.1 by a registered building contractor. What you are buying, read by someone who has built. Report within 24 hours.
Wannanup sits on a suburban island created by engineering. The 1994 Dawesville Channel — a man-made tidal canal built to flush algal blooms from the Peel-Harvey Estuary — cut the former suburb of Florida in half, leaving the northern portion on a strip of land surrounded by the Indian Ocean to the west, the Harvey Estuary to the east and the Channel to the south. A pre-purchase building inspection at Wannanup begins from that extraordinary geography: three sides of water, a canal network through the Port Bouvard development, and the tidal exposure that comes with all of it.
Multi-directional water exposure is the pre-purchase priority. A Wannanup home in a waterfront or near-waterfront position faces ocean or estuarine air from two or even three directions simultaneously. The seals, external fixings, balcony waterproofing and cladding on every elevation carry the load of that exposure, and in a pre-purchase context the read covers the whole envelope rather than focusing on the water-facing side alone. This is the element most likely to have been worked hard since the home was built, and finding where the exposure has overcome the original build quality is what the pre-purchase read is for.
For canal lots in Port Bouvard’s Northport and Eastport estates, the canal-bank ground is the second concern. A home built on managed fill beside a constructed canal waterway sits on ground with permanent tidal water on one side and engineered fill on the other, and the retaining structures that hold the bank, the drainage on the land side and the wall bases on the water-facing elevation all carry the record of how that position has been managed since the home was built.
The Dawesville Channel boundary is a site context worth understanding for homes close to it. The channel is an active tidal waterway that permanently altered the character of the estuary system, and homes near its banks face the full maritime exposure of a tidal boundary alongside the residential amenity it provides.
A pre-purchase inspection gives you the building scope on its own, to AS 4349.1, with the defects that matter set out plainly and separated from the cosmetic. At Wannanup, where three sides of water make the exposure constant and the canal-bank ground specific, that reading tells you what you are actually buying into. The report follows within 24 hours.
We run the same inspection across the area, including nearby Dawesville and Falcon.
MISSING: phone number · Book online → · Flat $440 inc GST, report within 24 hours.
A building inspection to AS 4349.1 that reads the structure and fabric before you buy, where three-sided water exposure from the Indian Ocean, Harvey Estuary and Dawesville Channel is the constant context.
No, it is the building scope only. If you want the pest check too, the combined building and pest inspection covers both in one visit.
In a waterfront or near-waterfront position, ocean or estuarine air can reach every elevation of the building. We read the full envelope, seals, fixings, balcony waterproofing and cladding on all sides, not just the water-facing one.
The retaining structures, drainage and water-facing wall bases on a Port Bouvard canal lot, where permanent tidal water on one side and engineered fill on the other create the same ground context as the Mandurah canal estates.
The 1994 man-made tidal canal that ended the Peel-Harvey Estuary's algal bloom crisis and created the boundary that defines Wannanup's southern edge.
For homes near the Channel boundary, it is an active tidal waterway with full maritime exposure. We note it as a site context alongside the building condition.
Yes. It sets the defects that matter out plainly and apart from the cosmetic, giving you a concrete basis to renegotiate or to proceed with confidence.
Yes. The Port Bouvard development transformed the suburb in the 21st century, and most of the stock is modern townhouses, canal-front homes and marina apartments.
Yes, where there is safe access. On canal-bank lots the subfloor drainage and condition are part of the ground read.
Within 24 hours of the inspection, with photos and a plain read of what matters, so you can act before your offer conditions close.
Also available as a combined building and timber pest inspection in Wannanup — both scopes in one visit to AS 4349.1 and AS 4349.3, one report within 24 hours.
Combined B&P inspection →Our office is at Suite 55, 15 Labouchere Road, South Perth WA 6151 — on the Swan River foreshore near the Perth Zoo.
Tell us about the property and what you need. We'll come back to you with a firm quote and a time.